MassDOT Announces Traffic Signal Repair on Route 3A at Beaver Dam Road on July 30
This information is courtesy of the Massachusetts Department of Transportation (MassDOT):
The Massachusetts Department of Transportation (MassDOT) is announcing that it will be performing a traffic signal repair on Route 3A northbound and southbound at Beaver Dam Road in Plymouth. The work is scheduled to take place on Thursday, July 30, and Friday, July 31, between 7:00 a.m. and 3:00 p.m. Work is anticipated to be completed by Friday afternoon, July 31.
Lane closures on Route 3A northbound and southbound will be in place. Temporary traffic alterations, including lane and shoulder closures, will occur as needed. At least one lane of travel will be maintained at all times, and police will assist with traffic control and safety setups.
Appropriate signage and messaging will be in place to guide drivers through the work area.
Drivers traveling through the affected area should expect delays, reduce speed, and use caution.
All scheduled work is weather dependent and subject to change without notice.
For more information on traffic conditions, travelers are encouraged to:
Dear Pilgrim
Have a local perspective to share? Send us your thoughts for the Pilgrim Letters.
Write to Us