Construction Notice: West Wind Shores 2 – Gull Lane Neighborhood Roadway Resurfacing Project-Plymouth
The Town of Plymouth is pleased to announce the Roadway Re-Surfacing Project for Cardinal Drive, Gull Lane, Oriole Way, Pheasant Avenue (#2 to #30), Sandpiper Lane, Scarlet Drive (#2 to #103), Skylark Avenue (#2 to Pheasant Ave Intersection) & Swan Avenue. This work is expected to start the week of October 5th. Barring any inclement weather and unforeseen circumstances, work is expected to occur between the hours of 7:00 AM to 4:30 PM, Monday to Friday and 8:00 AM to 4:00 PM on Saturdays if needed.
The work will consist of Roadway Reclamation (Grinding of Existing Paved Surface) and Re-Paving the roadways.
We anticipate this work will take approximately four to six (4 to 6) weeks to complete.
Before the start of construction, traffic barrels and signage will be in place to alert motorists and pedestrians of the construction. Residents may expect temporary parking restrictions, minor traffic delays, and possible daytime detours. We ask that you drive carefully and be alert to activity in the area.
We are asking that residents do not park their cars on the street within the work zone during the hours of 7:00 AM to 4:30 PM. Access to individual driveways should remain accessible, except when specifically working around your driveway. We ask that you look for alternative parking during those days.
The Town of Plymouth and our contractor Pawtucket Hot Mix Asphalt, Inc. will make every effort to minimize these inconveniences to residents and visitors to the area. However, due to the inherent nature of construction, some level of disruption may occur. Your cooperation with this important public works project is greatly appreciated.
If you have any questions or concerns, please feel free to contact Town Engineer Richard Bosse at 508-747-1620 ext. 10125.